New Richmond Area´s 24-Hour Information Source

Published April 09, 2010, 12:00 AM

PHOTOS: Library building construction


This is the back of the building. The large opening will be doors to the community area. A book drop and employees' entrance will be located along this wall.

  • This is the back of the building. The large opening will be doors to the community area. A book drop and employees' entrance will be located along this wall.
  • These windows will be in the employees' office area behind the circulation desk.
  • This is looking from behind the circulation desk area. The area near the windows will have comfortable chairs for reading in. The smaller opening is where the main door will be.
  • The teen area will be in the corner with blocks laid down.
  • The children's area will be under these block windows.
  • This is from the main entrance looking in. The children's area will be near the block windows, the circulation desk will be just before.
  • The community room and bathrooms will be on the far left area of this picture. The community room will be able to be open when the main library is not.
  • The new building will have lots of natural light. Large windows will be in the reading area (right windows) and adult stacks (left section).
  • The adult stacks will be located behind these windows.
  • The lounge/reading area will be located in the area behind this arch. The main entrance is to the left of the arch.
  • The entrance will be located behind the front column.
  • The parking lot is on the back of the building.